Indian Railways Achieves Breakthrough in 6.59-km Tunnel on Rishikesh-Karnaprayag Rail Project

Date:

Indian Railways has achieved a major breakthrough in Tunnel-14, a 6.59-km-long tunnel being constructed as part of the Rishikesh-Karnaprayag Rail Project in Uttarakhand.

The breakthrough has connected the two sections excavated from Sumerpur and Marora in Rudraprayag district. The tunnel comprises a 4.7-km section excavated from Portal-1 (Sumerpur) and a 1.79-km section from Portal-2 (Marora).

At Portal-1, engineers excavated a 110-metre stretch through loose soil beneath inhabited areas. Work on the main tunnel drive at Portal-2 began in March 2024, following the resolution of ground settlement and land acquisition issues. Controlled daytime blasting and specialised ventilation systems were also used to ensure safety during construction.

Engineers employed specialised techniques, including pre-excavation and multi-drifting, along with micropiles, rock bolts and consolidation grouting to tackle challenging geological conditions and ensure safe excavation.

This achievement marks a significant milestone in the rail project, which is expected to improve connectivity to the hilly regions of Uttarakhand and make travel easier for pilgrims and tourists.

(PIB)

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

spot_imgspot_img

Popular

More like this
Related

Indian Railways Approves Weekly Janakpur Dham–Ayodhya Train Service, Boosting India-Nepal Connectivity

Indian Railways has approved a new weekly train service...

Indian Railways Records All-Time High Freight Loading of 145.07 Million Tonnes in October 2026

According to official data, Indian Railways recorded its highest-ever...

Railway Minister Ashwini Vaishnaw Flags Off Bengaluru–Mumbai Vande Bharat Sleeper Express Train

On November 1, Railway Minister Ashwini Vaishnaw launched the...